 |
|
|
 |
 |
Since 07.06.97
when the modernized vessel was commissioned it has traveled over 14000 miles all over the
seas washing Europe and there have not been any problems as far as navigation and
technical performance are concerned. From November 8, 1998 till February 26, 1999 the
steam ship was at the yard of “Brodogradilishte Kralevitsa”, Croatia, where it
passed docking. All the main mechanisms and systems ensuring functioning of the vessel
were overhauled and repaired. All the above proves that the Topaz is a wonderful ship
comprising safety, reliability and comfort which is purposed
for cruise voyages of any distance and complicacy
Nevertheless one can have great time with friends during 3- or 5-hour (and more) voyage
along the coast of the Bolshoi Sochi enjoying its beautiful landscapes and dolphins
playing in line with the ship.
Depending on your wish the meal will be laid either in the wardroom or in the fresh air
on the passenger deck and the assortment of dishes and
beverages will be in full compliance with the high standards of hotel Radisson - SAS -
Lazournaya.
Irrespective of whether you are an inveterate angler or a beginner your heart will sink
when you see the live silver of fish
sparkling on the hook of your spinning. According to your wish during several minutes the
cook will turn it into a tasty dish which will be served to you.
You will get a brand new exciting experience of swimming in the open
sea feeling the abyss of 100-200 m and more below.
Onboard there is equipment enabling to hold mini-discos on the
passenger deck.
Nobody can remain indifferent seeing the fairy-tale splendour of the ship when playing
lights by night she follows dark and warm sea wave and passes the night Sochi displaying
its beauties. |
| Year and place of construction / modernization |
1988, Yugoslavia |
| Register class |
КМ Л3 1-А2 |
| IMO number |
8520953 |
| Maximum speed (knots) |
14 |
| Length overall, m |
44,5 |
| Breadth overall, m |
8,8 |
| Depth in midshipsection, m |
4,6 |
| Depth moulded, m |
18,6 |
| Draft |
2,7 |
| Gross tonnage, t |
493 |
| Deadweight (carrying capacity), t |
54 |
| Main engines power, kW |
DVS (Ulianik)
2х1320 |
| Fuel consumption in sea, t |
880 kg/h each ME |
| Crew number |
14 и 18
пассажиров |
| Duration of sail, days |
5 |
|
 |
|